Customization: | Available |
---|---|
After-sales Service: | 24 Hours 7 Days |
Warranty: | 10 Years |
Still deciding? Get samples of US$ 200/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
An I-beam is any of various structural members with an I- (serif capital letter 'I') or H-shaped cross-section. Technical terms for similar items include H-beam, I-profile, universal column (UC), w-beam, universal beam, rolled steel joist, or double-T (especially in Polish, Bulgarian, Spanish, Italian, and German). I-beams are typically made of structural steel and serve a wide variety of construction uses.
The horizontal elements of the I are called flanges, and the vertical element is known as the "web". The web resists shear forces, while the flanges resist most of the bending moment experienced by the beam. The Euler-Bernoulli beam equation shows that the I-shaped section is a very efficient form for carrying both bending and shear loads in the plane of the web. On the other hand, the cross-section has a reduced capacity in the transverse direction, and is also inefficient in carrying torsion, for which hollow structural sections are often preferred.
Products Name | I Beam Steel |
Standard | ASTM AISI JIS DNS GB etc |
Flange width: | 50-400mm or Customized |
Web thickness | 8-45mm or Customized |
Web Width: | 100mm~900mm or Customized |
Flange Thickness | 8-64mm,or customer's requirement |
Length | 6-12m or Customized |
Technique | Cold Rolled/Hot Dipped |
Material grade | SeriesS235JR/S235/S355JR/S355/SS440/SM400A/SM400B SS400-SS540 Series ST Series A36-A992 Series Gr50 Series |
Technical | Hot rolled,Cold rolled |
Processing Service | Bending, Welding, Decoiling, Cutting, Punching, Polishing |
Application | Widely used in various building structure and engineering structure, such as the beam, Bridges, transmission tower, lifting transportation machinery |
Delivery | 5-15 Days |
Package | Tandard Seaway Packing,Wooden case can be also provided. |
MOQ | 1 tons |
Payment terms | 30%TT+70% Balance |
Tolerance | ±1% |
Loading Port | Tianjin/Qingdao/Shanghai Port |